---
title: Storage When Your New Home Is Not Ready | O'Brien's
url: https://obriensmoving-storage.com/full-service-storage/storage-for-new-construction-delays/
business: O'Brien's Moving & Storage
address: 2277 Glendale Ave, Sparks, NV 89431
phone: 775-359-6683 (toll-free 1-800-253-7814)
hours: Monday to Friday 8:00 am to 5:00 pm
licenses: U.S. DOT No. 30611, MC-109375, Nevada CPCN 1070; interstate agent for Bekins Van Lines since 1955
type: Moving and storage company, family owned since 1941
---

- [Home](https://obriensmoving-storage.com/)
- [Full-service vault storage in Sparks](https://obriensmoving-storage.com/full-service-storage/)
- Storage when your new home is not ready

# Storage when your new home is not ready

If your new home is finished later than planned, vault storage from $40 per month keeps your furniture in 7 x 7 x 5 ft wooden vaults at our Sparks warehouse until move-in. Call on about 2 to 3 weeks notice and the goods are delivered the day the house is ready.

or call [775-359-6683](tel:+17753596683)

[4.3 on Google · 71 reviews](https://obriensmoving-storage.com/reviews/) Family owned since 1941 [U.S. DOT No. 30611](https://obriensmoving-storage.com/about/licenses-and-authority/)

Northern Nevada has a lot of new construction, and a new build rarely finishes on the day the builder first named. A final inspection, a missing appliance or a utility hookup can move a closing by weeks. Meanwhile the old house is sold, the lease is ending or the buyers are waiting, and the moving truck is still on the calendar for a house that cannot receive it. This is a common gap, and it is easy to fill. O'Brien's Moving & Storage loads your household at the old address, stores it in the Sparks warehouse, and delivers it to the new home when the keys are in your hand.

## At a glance

- Load now, deliver when the keys are in your hand
- 7 ft x 7 ft x 5 ft wooden vaults, from $40 per month
- Short or long term, so a slipped date is not a crisis
- About 2 to 3 weeks notice to deliver to the new address

## The gap between homes

The gap shows up in three ways. The first is the sold house with a firm out date and a new house that is not finished. The second is a lease that ends on the thirtieth, with a builder who says the middle of next month. The third is a family that has already moved out and is living with relatives or in a short-term rental, with furniture sitting in a garage. All three are solved the same way: put the household into storage and take it out later.

Storage in this setting is usually called storage between homes. We describe it in more detail on the [storage between moves](https://obriensmoving-storage.com/full-service-storage/storage-between-moves/) page. This page is for buyers whose gap exists because a build is running behind.

## How to plan around a moving completion date

Builders give a target and then confirm closer to the day. Ask for a written target date, and ask when the final walk-through will be. Then build the move in two steps. Step one is loading and storing at the old house, set to your out date. Step two is the delivery, which you book when the builder confirms the keys. Stored goods generally ship on about 2 to 3 weeks notice, so call 775-359-6683 when the builder gives you a firm date, not only on the day.

If the builder's date moves again, your goods stay in the vault and the delivery date moves with it. There is no need to cancel a truck or repack a house. That is the benefit of splitting the move into two steps.

- Get the builder's target date and the walk-through date in writing.
- Book the loading day at the old home against your out date.
- Our crew packs, wraps and stores your goods in vaults at the Sparks warehouse.
- When the builder confirms the keys, call the office on about 2 to 3 weeks notice.
- Crew delivers, places the furniture and removes the packing material.

## What it costs and how much space you need

Vault storage starts at $40 per month. Each wooden vault measures 7 ft x 7 ft x 5 ft, and the estimator counts the number you need during the free in-home estimate. You get 10 free heavy-duty boxes with that visit, so you can start on the closets and the garage early. Try the [storage vault sizer](https://obriensmoving-storage.com/tools/storage-vault-sizer/) before the visit for a first idea.

Because the vaults are in our own 30,000 sq ft warehouse at 2277 Glendale Ave, the same crew that loads you can deliver to the new address, in Reno, Sparks, Carson City, the Carson Valley or beyond.

## Moving in once the house is ready

On delivery day, the crew brings the vaults' contents to the new home and places the furniture in the rooms you choose. New homes often have fresh floors and walls, so tell the estimator about stairs, narrow doorways and any protection the builder expects. Most buyers also want to confirm that utilities are on and that the walk-through items are complete before the furniture arrives.

If you are moving from another state into a new build in the Reno area, see how your move is booked and coordinated through the Bekins network on the [interstate moving](https://obriensmoving-storage.com/interstate-moving/) page.

### Sources (checked October 18, 2026)

- [Consumer Financial Protection Bureau, closing on a home](https://www.consumerfinance.gov/owning-a-home/)
- [Nevada Real Estate Division](https://red.nv.gov/)
- [Nevada State Contractors Board](https://www.nvcontractorsboard.com/)

### Vault storage in Sparks

Wooden vaults, 7 ft x 7 ft x 5 ft each, in our 30,000 sq ft warehouse. Short or long term.

From $40 per month

[Storage options](https://obriensmoving-storage.com/full-service-storage/)

### Visit or call the office

2277 Glendale Ave, Sparks, NV 89431

[775-359-6683](tel:+17753596683)

| Monday to Friday | 8:00 am to 5:00 pm |
| --- | --- |
| Saturday and Sunday | Closed |

[Get my free estimate](#estimate)

### Related

- [Short-term storage between homes (storage in transit)](https://obriensmoving-storage.com/full-service-storage/storage-between-moves/)
- [Vault storage: how 7 x 7 x 5 ft wooden vaults work](https://obriensmoving-storage.com/full-service-storage/vault-storage/)
- [Storage vault sizer](https://obriensmoving-storage.com/tools/storage-vault-sizer/)
- [Free in-home moving estimate (plus 10 free heavy-duty boxes)](https://obriensmoving-storage.com/free-estimate/)

Storage by situation

## More services

- [### Storage while you sell your home Vault storage from $40 per month lets you move the extra furniture out of a listed home and into a 7 x 7 x 5 ft wooden vault at our Sparks warehouse.](https://obriensmoving-storage.com/full-service-storage/storage-while-selling-a-home/)
- [### Storage during a remodel A remodel clears the rooms, and vault storage from $40 per month gives your furniture a place to wait: 7 x 7 x 5 ft wooden vaults in our Sparks warehouse.](https://obriensmoving-storage.com/full-service-storage/storage-during-a-remodel/)
- [### Seasonal and second-home storage for Tahoe and Truckee owners Vault storage from $40 per month holds a second home's furniture, outdoor gear and seasonal decor in 7 x 7 x 5 ft wooden vaults at our Sparks warehouse.](https://obriensmoving-storage.com/full-service-storage/seasonal-and-second-home-storage/)
- [### Estate and downsizing storage When a home is being emptied after a loss or a downsize, vault storage from $40 per month gives families time: 7 x 7 x 5 ft wooden vaults...](https://obriensmoving-storage.com/full-service-storage/estate-and-downsizing-storage/)

Answers

## Storage when your new home is not ready questions

Still have a question? Call [775-359-6683](tel:+17753596683), Mon-Fri 8-5, or see the [moving FAQ](https://obriensmoving-storage.com/faq/).

### What if my builder delays closing again?

Your goods stay in the vault until you call. The delivery date moves with the closing, and storage is short or long term.

### How much is storage while I wait for the new home?

Vault storage starts at $40 per month. The vault count and monthly total are on your written estimate.

### How soon can you deliver once the house is ready?

Stored goods generally ship on about 2 to 3 weeks notice. Call 775-359-6683 as soon as the builder confirms a date.

### Can I get a few things out of storage before delivery?

Ask the office when you book. Plan which items you need first and tell the crew, so the loading order follows your list.

### Do you deliver to new subdivisions outside Reno?

O'Brien's serves Reno, Sparks, Carson City, the Carson Valley, Fernley, Fallon and Lyon County, among other areas.

## 4.3 stars from 71 Google reviews

What customers say about O'Brien's

[Read more reviews](https://obriensmoving-storage.com/reviews/)[See them on Google](https://maps.google.com/maps?cid=17335326057105140938)

J Janet M.

May 16, 2026

I was so impressed with the way the crew handled and packed each piece of furniture for short term storage. They were polite and professional. I would highly recommend them to anyone planning a move.

### Owner's reply

Janet we are so glad to hear that your move was a great success and we sincerely appreciate you providing us with this wonderful review. We will continue to provide you with the best service as we move forward.

F Francie H.

February 20, 2026

We were referred to O'Brien's Moving and Storage though a friend in Reno. We couldn't be more pleased with the Professionalism and Service. They were quick to set up Luke to come out and give us a quote and scheduled the actual move date right away. Luke was on time for our quote as were the movers on our moving day. All three of the gentlemen who moved us were professional and courteous from start to finish. From the initial phone call to the completion of our move, we felt like we were treated as family. We would definitely use them again and recommend O'Brien's Moving and Storage to our friends in the future.

### Owner's reply

Francie, Thank you for this amazing review. The result you have expressed is exactly what we all strive to accomplish. I love that you walked away knowing you are now a part of the O'Brien's family, whenever you need us we are a phone call away! I will let the movers know about the kind words expressed about them, that will be very satisfying for all of them. We will look forward to any referrals you send our way, thank you for the opportunity!

M Mark S.

January 22, 2026

Great company and local. They take great care of your moving needs. They are very accommodating and quick to respond. Highly recommend them for your moving needs and storage needs. Thanks to the O'Brien team for doing a fantastic job.

## Ask about vault storage

Vault storage starts at $40 per month. Tell us what you need to store and for how long.

Rather talk?

[Call 775-359-6683](tel:+17753596683) Monday to Friday, 8 am to 5 pm

Our estimators: Sean, Luke, Christa and Janet.

2277 Glendale Ave Sparks, NV 89431 [4.3 on Google · 71 reviews](https://obriensmoving-storage.com/reviews/) Family owned since 1941

U.S. DOT No. 30611 · MC-109375 · Nevada CPCN 1070
